Tile Estimating

Most tiling jobs begin with one of three questions: how many tiles, how much adhesive, and how much grout. Start with the part of the job you are buying first, then use the guides to check waste and box or bag rounding.

Tiles and finishes4 calculatorsGuides and quote prep included
Last checked

May 12, 2026

We checked the page logic, support notes, and related links on this page.

How to use it

Planning before buying

Use this project hub for a planning check, then confirm the final order or quote against live product data and site conditions.

Start with the right tiling question

Most tiling jobs begin with one of three questions: how many tiles, how much adhesive, and how much grout. Start with the part of the job you are buying first, then use the guides to check waste and box or bag rounding.

Tile Calculator

Estimate tile count, boxes, waste, and rough material cost for wall and floor tiling.

What changes a tile order most

Tile size, layout pattern, breakage risk, and whether the job needs separate adhesive and grout calculations are usually the biggest drivers of the final order.

When to increase waste

Increase the waste allowance for diagonal layouts, feature borders, awkward cuts, or jobs where future matching tiles may be difficult.

Before you order

Check tile box coverage, adhesive coverage, grout yield, and whether trims, movement joints, and backer boards need to be bought separately.

Popular tiling questions

Use these pages when you already know the room or wall area and want a quicker route into tile, adhesive, or grout quantities.

Tiling guides and buying checks

These guides help with waste, box counts, and the practical differences between common tiling products.

Use this project hub to brief suppliers or installers

Work through the core calculator first, then use the linked guides and quote checklist to request cleaner, more comparable prices.

  • Confirm what the quote should include: materials only, labour only, or both.
  • State access, finish level, timing, and any unknowns clearly.
  • Ask each supplier or installer to price the same scope and exclusions.

You can also open the wider Tile Estimating project hub if the quote depends on more than one material.